| Project Name: |
Countrywide Home Loans |
| Owner: |
Countrywide Home Loans |
| General Contractor: |
Stevens Lienweber Construction |
| Electrical Contract Amount: |
|
| Project Duration: |
4 mos |
| Completion Date: |
Jun 04 |
| CWHL elect room jb |
| Redundant power feeds from panelboards 1 st floor |
|
|
| CWHL elect room |
| Redundant power feeds from panelboards 2nd floor |
|
|
| CWHL floor boxes |
| Furniture feed installation after sawcut |
|
|
| CWHL ltg |
| Ltg. In cube farm before furniture install |
|
|
| CWHL power jb |
| Conduit from electric room toward furniture |
|
|